Here you will find relevant publications on Lewis Wind Power and the Stornoway Wind Farm, along with any notices or documents that we require to publish as part of our planning consent.
Stornoway Wind Farm Section 36 Consent – Decision
Stornoway Wind Farm Section 36 Consent – Decision
Stornoway Wind Farm Section 36 Consent - Additional Information #2
Stornoway Wind Farm Section 36 Consent - Additional Information #2
- AI#2 Appendix A Consultation with BT
- AI#2 Appendix B Consultation with Ironside Farrar_redacted
- AI#2 Appendix C Peat Technical Note
- AI#2 Appendix D1 SNH Clarifications Document
- AI#2 Appendix D2 - Confidential
- AI#2 Appendix D3 PAT Modelling Results_redacted
- AI#2 Appendix E Revised Borrow Pit Assessment
- AI#2 Appendix F Met Office Proposed Planning Conditions
- AI#2 Appendix G LVIA Technical Note
- AI#2 Figure 4.1 Site Layout
- AI#2 Report
Stornoway Wind Farm Section 36 Consent - Additional Information
Stornoway Wind Farm Section 36 Consent - Additional Information
- 00 AI Tech Note Jan 2020-(REDACTED)
- 01 AI Chapters
- 04 AI NTS_english
- 05 Revised Planning Statement - (REDACTED)
Figures
- AI Figure 4.1 Site Layout
- AI Figure 4.3 Typical gravity foundation
- AI Figure 4.5 Crane hard standing
- AI Figure 4.6 Typical Floating Road
- AI Figure 4.7 Typical Excavated Road
- AI Figure 4.12a_b Borrow Pit A
- AI Figure 4.13a-b Borrow Pit B
- AI Figure 4.14a_b Borrow Pit C
- AI Figure 4.15a_b Borrow Pit D
- AI Figure 4.16a_b Borrow Pit E
- AI Figure 7.1 Heritage assets
- AI Figure 10.1 Infrastructure and Telecoms-LOW RES
- AI Figure 11.2 Digital terrain model
- AI Figure 12.1 Receptor and Monitoring locations
- AI Figure 13.1 Traffic and Transport
Appendices
- AI Appendix 3A Interim Response Report-(REDACTED)
- AI Appendix 8A Non breeding bird survey Oct 18-March 19-(REDACTED)
- AI Appendix 8B Breeding Bird Surveys Apr-Sept 19 - (REDACTED)
- AI Appendix 8D Scoping
- AI Appendix 8E CRM - (REDACTED)
- AI Appendix 8F PVA Report - (REDACTED)
- AI Appendix 8G HRA
- AI Appendix 9B Phase 1 NVC - (LOW RES)
- AI Appendix 9F Vegetation sensitivity
- AI Appendix 9G Habitat loss calculations
- AI Appendix 9H PMP (FOR PUBLIC)
- AI Appendix 9I OHMP - (REDACTED)
- AI Appendix 9J Forestry
- AI Appendix 13B with and without BPs
Stornoway Wind Farm Section 36 Consent Application
Stornoway Wind Farm Section 36 Consent Application
- Application Letter
- Planning Statement
- Pre-Application Consultation Report
- EIA Report: Vol 1 - Non Technical Summary
- EIA Report: Vol 2 - Main Text
Figures
- Figure 1.1 Development Site Boundary
- Figure 1.2 Development Site Context
- Figure 3.1 Development Site Environmental Constraints
- Figure 3.2 Design Iterations
- Figure 4.10a Substation and compound (150m x 80m)
- Figure 4.10b Substation and compound 80m x 80m
- Figure 4.11a main temporary construction compound
- Figure 4.11b Satellite temporary construction compound
- Figure 4.12a Borrow Pit A
- Figure 4.12b Borrow Pit B
- Figure 4.12c Borrow Pit C
- Figure 4.12d Borrow Pit D
- Figure 4.12e Borrow Pit E
- Figure 4.13 Indicative Grid Connection Route
- Figure 4.14 Indicative Programme
- Figure 4.1 Site Layout
- Figure 4.2a Typical wind turbine 156m to tip
- Figure 4.2b Typical wind turbine 180m to tip
- Figure 4.3 Typical gravity base foundation
- Figure 4.4 Indicative wind tubrine rock anchor foundation
- Figure 4.5 Typical crane hard standing
- Figure 4.6 Typical floating road (option A and option B)
- Figure 4.7 Typical excavated road
- Figure 4.8 Typical bridge
- Figure 4.9 Typical Culvert
- Figure 6.10a Cumulative ZTV - Stornoway with Beinn Ghrideag and Pentland Road
- Figure 6.10b Cumulative ZTV - Stornoway with Beinn Ghrideag and Pentland Road
- Figure 6.11a Cumulative ZTV - Stornoway with Arnish Moor, Creed and Bridge Cottages
- Figure 6.11b Cumulative ZTV - Stornoway with Arnish Moor, Creed and Bridge Cottages
- Figure 6.12a Cumulative ZTV - Stornoway and Existing Wind Farms 10-35km
- Figure 6.12b Cumulative ZTV - Stornoway and Existing Wind Farms 10-35km
- Figure 6.13a Cumulative ZTV - Stornoway and Consented Wind Farms
- Figure 6.13b Cumulative ZTV - Stornoway and Consented Wind Farms
- Figure 6.14 Landscape Character (35km)
- Figure 6.15a Landscape Character (15km)
- Figure 6.15b Landscape Character (5km)
- Figure 6.16 Landscape Planning Designations (35km)
- Figure 6.17 National and Regional Recreational Routes (35km)
- Figure 6.18 Recreational Routes and Visitor Attractions within 15km
- Figure 6.19 Settlements within 15km with Blade Tip ZTV
- Figure 6.1 Landscape and Visual Study Area
- Figure 6.20a Stornoway Core Settlement with ZTV to Blade Tip
- Figure 6.20b Greater Stornoway Main Settlement with ZTV to Blade Tip
- Figure 6.20c Stornoway - Marybank, Maryhill, Newmarket, Newvalley ZTV to Blade Tip
- Figure 6.21a Sequential Route Assessment A859
- Figure 6.21b-f Sequential Route Assessment A859
- Figure 6.22a Sequential Route Assessment Pentland Road
- Figure 6.22b-d Sequential Route Assessment Pentland Road
- Figure 6.23a Sequential Route Assessment Stornoway - Ullapool Ferry Route
- Figure 6.23b-c Sequential Route Assessment Stornoway - Ullapool Ferry Route
- Figure 6.24 Viewpoint 1 A858 - Hebridean Way
- Figure 6.25 Viewpoint 2 Lewis War Memorial
- Figure 6.26 Viewpoint 3 A859 North of Luirbost
- Figure 6.27 Viewpoint 4 Cnoc na Croich (Gallows Hill)
- Figure 6.28 Viewpoint 5 Beinn Mholach
- Figure 6.29 Viewpoint 6 Eitseal
- Figure 6.2 ZTV with Viewpoint Locations to Blade Tip (35km @ A3)
- Figure 6.30 Viewpoint 7 A857 Between Stornoway and Barvas
- Figure 6.31 Viewpoint 8 Stornoway - Ullapool Ferry Route A
- Figure 6.32 Viewpoint 9 Tunga (Tong)
- Figure 6.33 Viewpoint 10 Raon na CrКadha, Stornoway
- Figure 6.34 Viewpoint 11 Ranais (Ranish)
- Figure 6.35 Viewpoint 12 Col (Coll)
- Figure 6.36 Viewpoint 13 Rathad a'Phentland (Pentland Road)
- Figure 6.37 Viewpoint 14 An Rubha - An Cnoc (Eye Peninsula - Knock)
- Figure 6.38 Viewpoint 15 Gearraidh Bhaird (Garyvard)
- Figure 6.39 Viewpoint 16 Stornoway - Ullapool Ferry Route B
- Figure 6.3 ZTV with Viewpoint Locations to Hub Height (35km @ A3)
- Figure 6.40 Viewpoint 17 Standing Stones of Calanais
- Figure 6.41 Viewpoint 18 An Rubha - Sulaisiader (Eye Peninsula - Shulishader)
- Figure 6.42 Viewpoint 20 B8011 East of Giosla
- Figure 6.43 Viewpoint 21 A857 near Barabhas (Barvas)
- Figure 6.44 Viewpoint 22 Tolastadh bho Thuath (North Tolsta)
- Figure 6.45 Viewpoint 23 An Cliseam (Clisham)
- Figure 6.46 Viewpoint 24 Upper Newvalley
- Figure 6.47 Viewpoint 25 Newmarket
- Figure 6.48 Viewpoint 26 Oliver's Brae
- Figure 6.49 Viewpoint 27 B897 Approach to A859
- Figure 6.4 ZTV to Blade Tip with Viewpoint Locations 100,000 scale
- Figure 6.50 Viewpoint 28 Iolaire Monument
- Figure 6.5 ZTV to Blade Tip with Viewpoint Locations 50,000 scale
- Figure 6.6a Comparative ZTV Consented and Proposed Development (Blade Tip)
- Figure 6.6b Comparative ZTV Consented and Proposed Development (Hub Height)
- Figure 6.7 Detailed ZTV to Blade Tip (15km @ A3)
- Figure 6.8 Cumulative Wind Farms within 35km
- Figure 6.9a Cumulative ZTV - Stornoway and Existing Wind Farms within 10km
- Figure 6.9b Cumulative ZTV - Stornoway and Existing Wind Farms within 10km
- Figure 7.1 Proposed Site Layout and Heritage Assets within Study Area
- Figure 7.2 Potential Indirect Effect Receptors within Extended Study Area
- Figure 7.3 Potential indirect effect receptors witin 15km Study Area
- Figure 7.4 Druim Dubh
- Figure 7.5 Achmore Stone Circle
- Figure 10.1 Infrastructure and Telecoms
- Figure 11.10 Hydrological and Hydrogeological Constraints
- Figure 11.1 Hydrology and Hydrological Receptors
- Figure 11.2 Digital Terrain Model
- Figure 11.3 Geological Plan of the Development Area
- Figure 11.4 Slope Stability Plan
- Figure 11.5 Main and Sub Catchments
- Figure 11.6 Monitoring Locations
- Figure 11.7 Development Area Flood Zone Extents
- Figure 11.8 Abstraction and Discharge Licences
- Figure 11.9a GWDTE
- Figure 11.9b GWDTE
- Figure 11.9c GWDTE
- Figure 11.9d GWDTE
- Figure 11.9e GWDTE
- Figure 12.1 Receptor and Monitoring Locations
- Figure 13.1 Traffic and Transport
- Figure 15.1 Shadow Flicker Study Area
Appendices
- Appendix 1A Glossary and Abbreviations
- Appendix 1B Stornoway S36 consent 7 Sept 2012
- Appendix 1C Stornoway S36 Variation 22 March 2016
- Appendix 1D Stornoway direction 16 June 2017
- Appendix 2A Scoping Report
- Appendix 2B Stornoway Wind Farm - Scoping Opinion - 27 September 2018
- Appendix 2C ECU Regulation 5(3) compliance response
- Appendix 2D Gatecheck Report
- Appendix 6A Methodology and Glossary Final
- Appendix 6B Viewpoint Analysis Final
- Appendix 6C Residential Visual Amenity Assessment Final
- Appendix 6C Fig 6C.1a Residential Receptors within 2km
- Appendix 6C Figure 6C.10 Group F - Residential Properties 18, 19, 22, 26
- Appendix 6C Figure 6C.11 Group G - Residential Properties 20, 23, 27
- Appendix 6C Figure 6C.12 Group H - Residential Properties 24, 28, 29, 30
- Appendix 6C Figure 6C.13 Group I - Properties 25, 31, 32, 33
- Appendix 6C Figure 6C.14 Druim Dubh (excluded property)
- Appendix 6C Figure 6C.1b Residential Receptors (Detailed)
- Appendix 6C Figure 6C.2 Group A - Residential Properties 1, 2
- Appendix 6C Figure 6C.3 Group A - Residential Properties 3, 4
- Appendix 6C Figure 6C.4 Group A - Residential Properties 5, 6, 7
- Appendix 6C Figure 6C.5 Group A - Residential Properties 13, 17
- Appendix 6C Figure 6C.6 Group B - Residential Properties 8, 15
- Appendix 6C Figure 6C.7 Group C - Residential Properties 9, 11, 12
- Appendix 6C Figure 6C.8 Group D - Residential Properties 10 , 16, 21
- Appendix 6C Figure 6C.9 Group E - Residential Property 14
- Appendix 6D Night-time Assessment Final
- Appendix 6D Figure 6D.1 Turbine Lighting Plan
- Appendix 6D Figure 6D.2 40001-GOS308 ZTV (Nacelle Lights) and Night-time Viewpoint Locations
- Appendix 6D Figure 6D.3 40001-GOS309 ZTV (Tower Lights) and Night-time Viewpoint Locations
- Appendix 6D Figure 6D.4 40001-GOS310 Cumulative ZTV (Nacelle Lights) to 15km
- Appendix 6D Figure 6D.5 40001-GOS311 Viewpoint N3 A859 North of Liurbost
- Appendix 6D Figure 6D.6 40001-GOS312 Viewpoint N7 A857 between Stornoway and Barvas
- Appendix 6D Figure 6D.7 Viewpoint N9 Tunga
- Appendix 6D Figure 6D.8 Viewpoint N11 Ranais (Ranish)
- Appendix 6D Figure 6D.9 40001-GOS315 Viewpoint N14 An Rubha - An Cnoc (Eye Peninsula - Knock)
- Appendix 6E Figure 6E.1 Viewpoint A Co-op
- Appendix 6E Figure 6E.2 Viewpoint B Stornoway Ferry Terminal
- Appendix 6E Figure 6E.3 Viewpoint C Gress to Tolsta Road
- Appendix 7A Heritage Assets
- Appendix 8A Ornithology Desk Based Review
- Appendix 8B Non breeding bird surveys Oct 17-March 18
- Appendix 8C Breeding Bird Surveys April-Sept 18
- Appendix 8E Scoping of Assessment
- Appendix 8F CRM Report
- Appendix 8G Lewis Peatlands SPA CRM and PVA
- Appendix 9A Ecological Desk Study
- Appendix 9B - Phase 1 and NVC Survey
- Appendix 9D Electrofishing Survey Dec 2018
- Appendix 9E Scoping of assessment summary
- Appendix 9F Vegetation Sensitivity and Approach to Avoidance
- Appendix 9G Habitat loss and Disturbance Calculations
- Appendix 9H Peat Management Plan (Without App G Confidential In) - - low res
- Appendix 9J Forestry Note
- Appendix 11A Relevant policy and techical guidance list
- Appendix 11B Groundwater vulnerability map for Scotland
- Appendix 11C Water Crossings Photograhps
- Appendix 11D Applicants Historic Water Quality Data
- Appendix 11E Water Body Sheet Combined
- Appendix 11F GWDTE Assessment Combined
- Appendix 11G Summary of significance of predicted geology, hydrology and hydrogeology effects
- Appendix 12A Noise
- Appendix 13A Swept Path Analysis Report
- Appendix 13B Vehicle Movements with and without BPs
Other Publications